This meeting was chaired by Shri. Janak Bhalaria (President – Laghu Udyog Bharati, Bhayander Unit), Shri. Bajrang Agarwal (Secretary – Laghu Udyog Bharati, Bhayander Unit) & Shri. Bhushan Marde (General Secretary – Laghu Udyog Bharati, Konkan Prant) and was conducted at the office of Shri. Bajrang Agarwal (3 January, 2019).
This meeting was called to discuss the alarming hike in the Unit Consumption and following was decided –
1- All the meters would be thoroughly rechecked
2- Test Meters would be placed at 5 different factories, of which, to maintain Transparency, 2 meters would be installed by the Adani Electricity Mumbai Limited, while 3 would be installed by the Laghu Udyog Bharati, Bhayander Unit.
3 – Though we are requesting for a One Point Contact to address all the future factory concerns (instead of running from department to department), related to Power Supply, we have been assured of monthly/bi-monthly interactions between both.
We also appreciate the team of Adani Electricity Mumbai Limited, who took this meeting on Priority and were Sensitive to our concerns. A 10 – member team was present for this meeting from different departments of the Adani Electricity Mumbai Limited.